Compare similar product
Product Info: |
||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Current product | First Similar product | |||||||||||||
| Image: |
|
|
||||||||||||
| Mouser Part No: | 579-MCP1652R-E/MS | 579-MCP1652RT-E/MS | ||||||||||||
| Mfr.'s Part No: | MCP1652R-E/MS | MCP1652RT-E/MS | ||||||||||||
| Manufacturer: | Microchip Technology | Microchip Technology | ||||||||||||
| Description: | Switching Controllers w/Pgd Ind UVLO 2V | Switching Controllers w/Pgd Ind UVLO 2V | ||||||||||||
| Lifecycle: | - | - | ||||||||||||
| Datasheet: | MCP1652R-E/MS Datasheet (PDF) | MCP1652RT-E/MS Datasheet (PDF) | ||||||||||||
| RoHS: | ||||||||||||||
Specifications |
||||||||||||||
| Brand: | Microchip Technology | Microchip Technology | ||||||||||||
| Country of Assembly: | Not Available | Not Available | ||||||||||||
| Country of Diffusion: | Not Available | Not Available | ||||||||||||
| Country of Origin: | TH | TH | ||||||||||||
| Duty Cycle - Max: | 88 % | - | ||||||||||||
| Maximum Operating Temperature: | + 125 C | + 125 C | ||||||||||||
| Minimum Operating Temperature: | - 40 C | - 40 C | ||||||||||||
| Moisture Sensitive: | Yes | Yes | ||||||||||||
| Mounting Style: | SMD/SMT | SMD/SMT | ||||||||||||
| Number of Outputs: | 1 Output | - | ||||||||||||
| Operating Supply Current: | 120 uA | - | ||||||||||||
| Output Current: | 100 mA | - | ||||||||||||
| Output Voltage: | 12 V | - | ||||||||||||
| Package/Case: | MSOP-8 | MSOP-8 | ||||||||||||
| Packaging: | Tube | Reel | ||||||||||||
| Product Type: | Switching Controllers | Switching Controllers | ||||||||||||
| Standard Pack Qty: | 100 | 2500 | ||||||||||||
| Subcategory: | PMIC - Power Management ICs | PMIC - Power Management ICs | ||||||||||||
| Switching Frequency: | 750 kHz | - | ||||||||||||
| Topology: | Boost | - | ||||||||||||
| Operating Supply Voltage: | - | 5.5 V | ||||||||||||
Ordering Information |
||||||||||||||
| Stock: | 358 Can Dispatch Immediately | 1.490 Can Dispatch Immediately | ||||||||||||
| Factory Lead Time: | - | 3 Weeks Estimated factory production time for quantities greater than shown. | ||||||||||||
| Buy: |
|
|
||||||||||||
| Pricing: |
|
|||||||||||||
